This register includes the latest design specification documents otherwise known as “DS”. DS documentation may include things such as but not limited to tolerancing, acceptance criteria and processing requirements. Suppliers should verify they have the latest version of applicable DS documents as specified by the design during contract review.
The supplier quality requirements above those specified in Eaton’s Global Supplier Excellence Manual for Goods specifically supplied to Eaton’s Wimborne facility.
This Form is a standard template for suppliers to inform Wimborne of a major change request to the manufacture of Mission Systems Division parts being manufactured.
Request a formal response to a query related to works to be carried out at suppliers for Wimborne. Typically relating to design and manufacturing queries, obsolescence and part availability issues. This form does not permit deviation from design data, please refer to external MRB form.
The Supplementary Flow down Terms for KC46 Aircraft. If it is unclear which End Product supplies are intended for and which terms are applicable, please contact Eaton’s Wimborne facility.
The Supplementary Flow down Terms for the Air to Ground Missile Launcher. If it is unclear which end product supplies are intended for and which terms are applicable, please contact Eaton?s Wimborne facility.
The Supplementary Flow down Terms for the Jaguar Over Wing Launcher. If it is unclear which end product supplies are intended for and which terms are applicable, please contact Eaton?s Wimborne facility.
Previous Supplier Quality Assurance Manual detailing supplier quality requirements for supplies into Cobham Mission Systems Wimborne (now known as Eaton’s Mission Systems Division, Wimborne). This document may be used for suppliers still delivering under contract in reference to FRL/QM/10.
The purpose of this document is for suppliers to formally acknowledge they have read and understood the defined requirements within the Eaton’s Global Supplier Excellence Manual.
The terms and conditions above those specified in Eaton’s Standard Terms and Conditions as specified in Eaton’s Global Supplier Excellence Manual for Goods specifically supplied to Eaton’s Wimborne facility.
The Supplementary Flow down Terms for KC390 Aircraft. If it is unclear which end product supplies are intended for and which terms are applicable, please contact Eaton?s Wimborne facility.
The Supplementary Flow down Terms for the V22 Probe. If it is unclear which end product supplies are intended for and which terms are applicable, please contact Eaton’s Wimborne facility.
The Supplementary Flow down Terms for the United States government relating to Defense Federal Acquisition Regulation Supplement (DFARS) and Federal Acquisition Regulation (FAR) Flow down provisions for purchase orders under a U.S. government contract.